Brief details of the Phase III Refinery Project
The objective of this project having an investment out lay of Rs.12,160 Crore is as follows :
- Expansion of Capacity by adding additional 3 MMTPA crude processing
- Up-gradation of low value products to high value products.
- To process cheaper/opportunity crudes ( Sour/ Heavy & High TAN crudes)
- Production of petrochemical feed stocks Viz. Propylene.
- Maximize distillate yield.
- Upgrading entire HSD into BS III/IV grade
MRPL is also executing a Polypropylene unit with an investment outlay of Rs.1803.78 Crore having an objective of producing Polypropylene from the Propylene produced in PFCCU, which is a value added product.
Following are the salient features of the various units that are being executed:
| Units/Licencor | Capacity (MMTPA) |
| Crude & Vacuum Distillation Unit inclusive of LPG Treatment. (CDU/VDU) Technology from EIL | 3.0 |
| Petro Fluidised Catalytic Cracking , Propylene Recovery and Naphtha Splitter (PFCC). Licensor: Shaw Stone & Webster, USA | 2.2 |
| Delayed Coker Unit (DCU) Licensor: Lummus, USA | 3.0 |
| Diesel Hydrotreating Unit (DHDT). Licensor: Axens, France | 3.7 |
| Coker Heavy Gas Oil Hydrotreating Unit (CHT). Licensor: UOP, USA | 0.65 |
| Hydrogen Generation Unit (HGU) / L &T: Licensor: Haldor Topsoe AS | 70 KTPA |
| Sulphur Recovery Unit (SRU) Licensor: EIL /Siirtec Nigi (Italy) | 3 x 185 TPD |
| ATF / Kero Treatment Unit. Licensor: UOP,USA | 70 TPH |
| Polypropylene Unit Licensor: Novolen, Germany | 440000 TPA |
| Hydrocracker Unit Revamp - 1 / 2, Licensor: UOP,USA | 1.6 / 1.7 MMTPA |
| Captive Power Plant (CPP) / BHEL ( 2 Steam Turbine Generators, 2 Gas Turbine Generators- Frame 5 & Frame 6) | 118 MW |
| Tankages | 23 Nos. |
| Mounded Bullets | 04 Nos. |
Engineers India Limited are the Project Management Consultants for the Phase III Refinery project. M/s. Jacobs Engineering India Ltd. are the EPCM Consultant for CDU/VDU. Following are the major LSTK/OBE contractors.
| Unit | Contractor |
| Petro Fluidized Catalytic Cracking Unit (PFCCU) | EIL - OBE/LSTK |
| Sulphur Recovery Unit (SRU) | EIL - OBE/LSTK |
| Polypropylene Unit ( PPU) | EIL - OBE/LSTK |
| Crude / Vacuum Distillation Unit ( CDU/VDU) | Jacobs - EPCM Onshore - Piping contractor |
| Captive Power Plant (CPP) | BHEL |
| Diesel Hydrotreating Unit (DHDT) | L & T, Vadodara |
| Hydrogen Generation unit (HGU) | L & T , Mumbai |
Delayed Coker Unit ( DCU) ( 4 sub packages)
|
|
| Coker Gas Oil Hydrotreating Unit (CHTU) | TICB, Mumbai |
| Offsite Piping | Designed by EIL and executed by Punj Lloyd |
The Phase III project has interconnections with the existing Phase I & II refinery with respect to Hydrocarbon streams.
The Phase III - refinery project is scheduled to be completed mechanically on 31/10/2011. The Polypropylene unit is scheduled to be mechanically completed on 30-04-2012.
Major Incremental Products :
- Propylene - 454 TMT/yr
- Additional LPG - 730 TMT/yr
- Additional HSD - (BS III - 720 TMT/yr & BS IV - 720 TMT/yr)
- Petcoke: 1000 TMT/yr
The project is presently on schedule and expected to be completed as per the schedule.